Problem:

A splitter box at a Central Florida utility was experiencing reduced capacity due to a significant buildup of sand and grit. Wastewater treatment facilities typically employ a splitter box to separate influent flow to various structures such as aeration basins or clarifiers. This Central Florida splitter box had a visible level of sand above the water line that needed to be cleaned, and the structure measured approximately 40-feet by 25-feet. The utility was also unable to divert flow or take the structure offline, adding another level of complexity to the project.

Solution:

USST crew mobilized to the site, bringing with them a powerhouse of equipment, the Combination3® Truck, outfitted with extended boom, downhole pump, and jetter. While the splitter box was in full operation, USST utilized the GritGone Process® to remove sand and grit material.

Results:

22 total cubic yards of sand and grit was removed from the splitter box. Because the box did not have to be taken offline or drained down, risky confined space entry was not necessary. “Cleaning in submerged conditions while in operation is our specialty,” said Denver Stutler, Jr., USST CEO. “Not having to drain down structures and keep our crew out of confined space allows us to solve problems that may not have been previously solvable.”

View the entire case study here.

 Central Florida - Splitter Box Cleaned While In Operation 22-Cubic Yards of Sand Removed

 Central Florida - Splitter Box Cleaned While In Operation 22-Cubic Yards of Sand Removed

Share this article:
Image

Tags: 

More Recent Posts

Subscribe

Get news delivered straight to your inbox the day it gets published.

"*" indicates required fields

Name*
This field is for validation purposes and should be left unchanged.